← Back to map

Hickory Ridge Landfill Solar Project

DeKalb County, Georgia · EIA plant ID 59459 · Operator: BFI Waste Systems of GA, LLC
SolarSolar PhotovoltaicBA: SEPA
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%20142016201820202022202420260.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20140.44.2%—
20150.44.2%—
20160.67.0%—
20170.56.0%—
20180.11.1%—
201900.0%—
202000.0%—
202100.0%—
202200.0%—
202300.0%—
202400.0%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5088Solar PhotovoltaicPV0.60.6Sep 2011Operating—coming soon

Owner / operator

Operator: BFI Waste Systems of GA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BFI Waste Systems of GA, LLC100.0%1 MW

Nearby plants

Within 80 km.
MAS ASB Cogen Plant7 MW5.5 km
Inforum1 MW11 km
Georgia Pacific Center1 MW11.3 km
191 Peachtree Tower2 MW11.4 km
Atlanta Falcons Solar1 MW11.7 km
Atlanta Gift Mart LP1 MW11.8 km