COC Surry LFG, LLC
Surry County, North Carolina · EIA plant ID 59439 · Operator: Petra Engineering
Nameplate2MWSummer 2 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor63%other units, summer MW
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2014 | 6.9 | 52.7% | — |
| 2015 | 7.6 | 57.5% | — |
| 2016 | 7 | 53.1% | — |
| 2017 | 6.4 | 48.4% | — |
| 2018 | 6.8 | 51.5% | — |
| 2019 | 8.2 | 62.2% | — |
| 2020 | 7.3 | 55.4% | — |
| 2021 | 6.3 | 48.0% | — |
| 2022 | 5.7 | 43.6% | — |
| 2023 | 7.6 | 58.0% | — |
| 2024 | 8.8 | 66.9% | — |
| 2025 | 8.3 | 63.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| UNIT1 | Landfill Gas | IC | 1.6 | 1.5 | May 2013 | Operating | — | coming soon |
Owner / operator
Operator: Petra Engineering. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Barnabas Investment Group | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Ararat Rock Solar, LLC | 4 MW | 3.8 km |
| Mayberry Solar LLC | 1 MW | 5.1 km |
| Double Creek | 5 MW | 14.4 km |
| Hayes Solar, LLC | 3 MW | 16.1 km |
| Stony Knoll Solar, LLC | 23 MW | 18.5 km |
| Two Hearted Solar | 22 MW | 22.6 km |