← Back to map

Zimmerman Energy

Marshall County, Indiana · EIA plant ID 59425 · Operator: Landfill Energy Systems
OtherLandfill GasMISOBA: MISO
Nameplate8MWSummer 7 MW
Generators4in service
Net generation40GWh12 mo to Jul 2026
Capacity factor64%other units, summer MW
Heat rate—thermal plants only
First online2014

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202663.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20143.542.5%—
201549.298.6%—
201646.492.7%—
201745.991.9%—
201845.490.9%—
201945.891.6%—
202046.591.1%—
202159.195.0%—
20225182.0%—
202353.485.9%—
202438.461.6%—
202540.565.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ZE#4Landfill GasIC1.61.4Dec 2020Operating—coming soon
ZE-#1Landfill GasIC21.9Nov 2014Operating—coming soon
ZE-#2Landfill GasIC21.9Nov 2014Operating—coming soon
ZE-#3Landfill GasIC21.9Nov 2014Operating—coming soon

Owner / operator

Operator: Landfill Energy Systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Landfill Energy Systems100.0%8 MW

Nearby plants

Within 80 km.
Bremen7 MW26 km
Prairie View I & II LFGTE6 MW29.2 km
Walkerton1 MW31.5 km
Mammoth North Solar400 MW32.7 km
IMPA Winamac Solar Park3 MW34.3 km
Mammoth South Solar Project—40.5 km