Facile Solar

Alamance County, North Carolina · EIA plant ID 59406 · Operator: Facile Solar LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300400MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202620.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20150.511.6%—
20163.721.2%—
20173.620.4%—
20183.218.2%—
2019316.9%—
20202.212.2%—
20212.514.3%—
20223.519.7%—
20232.916.7%—
20240.84.5%—
20253.520.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SYS1Solar PhotovoltaicPV22Oct 2015Operating—coming soon

Owner / operator

Operator: Facile Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Green Street Carolinas LLC100.0%2 MW

Nearby plants

Within 80 km.
Manning PV 15 MW3.3 km
Frieden4 MW5.1 km
Lotus4 MW5.8 km
Big Boy3 MW12.8 km
Nick Solar5 MW12.9 km
Bakatsias Solar5 MW13.5 km