Quinto Solar PV Project

Merced County, California · EIA plant ID 59339 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate108MWSummer 105 MW
Generators1in service
Net generation243GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202626.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201525.916.9%—
201628130.4%—
2017280.130.4%—
2018283.830.8%—
2019258.828.1%—
2020266.128.8%—
2021275.229.9%—
2022281.930.6%—
2023213.523.2%—
202425727.8%—
2025242.526.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SSC13Solar PhotovoltaicPV108105.1Nov 2015Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%108 MW

Nearby plants

Within 80 km.
ONeill25 MW3.5 km
W R Gianelli424 MW7.1 km
Gonzaga Ridge Wind Farm133 MW9.9 km
Central 4040 MW13.7 km
Dinosaur Point17 MW14 km
Gonzaga Ridge Battery Facility52 MW14.4 km