← Back to map

Franklin 1

Norfolk County, Massachusetts · EIA plant ID 59178 · Operator: CD US Solar MT 2 LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202616.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20130.35.8%—
20144.617.4%—
20154.617.3%—
20164.918.6%—
20174.416.6%—
2018415.1%—
20193.613.9%—
20203.312.4%—
20214.115.6%—
20223.613.8%—
20234.115.7%—
20244.215.8%—
20254.416.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KRS04Solar PhotovoltaicPV33Nov 2013Operating—coming soon

Owner / operator

Operator: CD US Solar MT 2 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD US Solar MT 2 LLC100.0%3 MW

Nearby plants

Within 80 km.
Kearsarge Upper Union2 MW1.1 km
Franklin 24 MW1.5 km
Wilmarth Solar7 MW3.7 km
126 Grove Solar LLC2 MW4.6 km
5 Berry7 MW4.8 km
Kearsarge Bellingham PV3 MW6.4 km