← Back to map

Christiana

New Castle County, Delaware · EIA plant ID 591 · Operator: Calpine Mid-Atlantic Generation LLC
OilPetroleum LiquidsPJMBA: PJM
Nameplate55MWSummer 50 MW
Generators2in service
Net generation1GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate28,297Btu/kWhfossil units, electric fuel, HHV
First online1973Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.52GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%1%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
15,00020,00025,0002005201020152020202528,297 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014.8——
20022.6——
20032.50.6%17,154
20040.70.2%22,914
20051.20.3%19,998
20060.60.2%24,857
20070.20.1%—
20080.10.0%—
20090.40.1%27,191
20100.50.1%26,810
20110.10.0%—
201200.0%—
2013-0.1-0.0%—
20141.20.3%25,492
20151.10.3%18,160
20160.10.0%21,618
20170.20.0%—
20180.80.2%—
20190.20.1%—
202000.0%—
20210.20.0%27,900
20221.50.3%23,457
20230.20.1%—
20240.20.1%—
20250.80.2%28,297

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CH11Petroleum LiquidsGT27.525Jun 1973Operating (Standby / backup)—coming soon
CH14Petroleum LiquidsGT27.525Jun 1973Operating (Standby / backup)—coming soon
CHCHPetroleum LiquidsGT5644Jun 1973not_current—coming soon

Owner / operator

Operator: Calpine Mid-Atlantic Generation LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Calpine Mid-Atlantic Generation LLC100.0%55 MW

Nearby plants

Within 80 km.
WHA Southbridge Solar Park CSG1 MW1.1 km
DD Hay Road Solar 23 LLC1 MW2.3 km
Hay Road1,098 MW3 km
Edge Moor710 MW3 km
Croda Atlas Point CHP4 MW4.1 km
South Campus Solar2 MW5.8 km