Nameplate204MWSummer 204 MW
Generators1in service
Net generation463GWh12 mo to Aug 2026
Capacity factor26%wind units, summer MW
Heat rate—thermal plants only
First online2015
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 49.8 | 32.8% | — |
| 2016 | 684.7 | 38.2% | — |
| 2017 | 682.8 | 38.2% | — |
| 2018 | 692.2 | 38.7% | — |
| 2019 | 688 | 38.5% | — |
| 2020 | 684.1 | 38.2% | — |
| 2021 | 535.6 | 30.0% | — |
| 2022 | 538.3 | 30.1% | — |
| 2023 | 526.4 | 29.4% | — |
| 2024 | 472.7 | 26.4% | — |
| 2025 | 444.5 | 24.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SHAN1 | Onshore Wind Turbine | WT | 204 | 204 | Dec 2015 | Operating | — | ge 1.7-103 |
Owner / operator
Operator: Shannon Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Shannon Wind LLC | 100.0% | 204 MW |
Nearby plants
Within 80 km.
| Windthorst-2 | 68 MW | 13 km |
| Bobcat Bluff Wind Project LLC | 161 MW | 20.6 km |
| Red Hollow Renewable Energy | — | 24.1 km |
| Senate Wind LLC | 150 MW | 33.8 km |
| Trinity Hills | 198 MW | 35.5 km |
| Olney | 20 MW | 36.8 km |