← Back to map

Stonewall

Loudoun County, Virginia · EIA plant ID 59004 · Operator: potomac energy center llc
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate812MWSummer 766 MW
Generators3in service
Net generation4,706GWh12 mo to Aug 2026
Capacity factor70%gas/coal/oil units, summer MW
Heat rate7,037Btu/kWhfossil units, electric fuel, HHV
First online2017Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2018202020222024202670.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,6006,8007,0007,200201820202022202420267,037 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20173,291.665.1%7,048
20184,868.372.5%6,876
20193,957.759.0%7,164
20204,951.573.6%7,007
20215,060.975.4%7,114
20223,500.352.2%7,180
20234,430.166.0%7,054
20244,833.271.8%6,822
20254,742.370.7%6,953

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combined CycleCT237220Apr 2017Operating—coming soon
GEN2Natural Gas Fired Combined CycleCT237220Apr 2017Operating—coming soon
GEN3Natural Gas Fired Combined CycleCA338326Apr 2017Operating—coming soon

Owner / operator

Operator: potomac energy center llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
potomac energy center llc100.0%812 MW

Nearby plants

Within 80 km.
Evergreen Energy Center, LLC—3.5 km
Dulles Solar and Storage—12.6 km
Montgomery County Resource Recovery68 MW17.6 km
Dickerson326 MW18.2 km
Dickersonretired18.2 km
Reston Town Center Solar 11 MW19.5 km