← Back to map

BearPond Solar Center LLC

Vance County, North Carolina · EIA plant ID 58955 · Operator: BearPond Solar Center LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor10%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20142016201820202022202420269.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20140.26.1%—
20159.121.6%—
201613.632.3%—
2017921.4%—
20188.921.1%—
2019921.3%—
20208.620.3%—
20219.121.6%—
20227.417.6%—
20235.813.7%—
20248.720.5%—
20254.19.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BEARSolar PhotovoltaicPV4.84.8Dec 2014Operating—coming soon

Owner / operator

Operator: BearPond Solar Center LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BearPond Solar Center LLC100.0%5 MW

Nearby plants

Within 80 km.
Martin Creek Farm LLC3 MW1.4 km
Southerland Farm Solar5 MW1.4 km
Dement Farm LLC5 MW2.7 km
Vance Solar Farm, LLC5 MW3.7 km
Melinda Solar5 MW4 km
Vicksburg Solar5 MW6.2 km