Temple SEGF
Philadelphia County, Pennsylvania · EIA plant ID 58897 · Operator: Temple University
Nameplate16MWSummer 16 MW
Generators10in service
Net generation1GWh12 mo to Aug 2026
Capacity factor1%gas/coal/oil units, summer MW
Heat rate13,142Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as rarely runs
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 1 | 0.7% | 9,714 |
| 2014 | 0.6 | 0.4% | 12,392 |
| 2015 | 0.9 | 0.7% | 12,226 |
| 2016 | 0.9 | 0.6% | 12,790 |
| 2017 | 1.4 | 1.0% | 12,331 |
| 2018 | 1.1 | 0.8% | 12,634 |
| 2019 | 1.4 | 1.0% | 12,719 |
| 2020 | 0.9 | 0.6% | 12,241 |
| 2021 | 1.1 | 0.8% | 12,089 |
| 2022 | 1.2 | 0.8% | 11,948 |
| 2023 | 0.7 | 0.5% | 12,574 |
| 2024 | 1.1 | 0.8% | 12,697 |
| 2025 | 1.3 | 0.9% | 13,142 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 19G01 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G02 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G03 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G04 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G05 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G06 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G07 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G08 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G09 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
| 19G10 | Natural Gas Internal Combustion Engine | IC | 1.6 | 1.6 | May 1993 | Operating | — | coming soon |
Owner / operator
Operator: Temple University. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Temple University | 100.0% | 16 MW |
Nearby plants
Within 80 km.
| Delaware Generating Station | 77 MW | 2.5 km |
| Salvation Army Solar | 1 MW | 5 km |
| Grays Ferry Cogeneration | 193 MW | 5.3 km |
| Schuylkill Generating Station | 40 MW | 5.3 km |
| PWD Northeast WPCP Biogas Cogen Plant | 6 MW | 5.8 km |
| BNB Camden Solar | 4 MW | 5.8 km |