← Back to map

Redcrest Solar Farm

Kern County, California · EIA plant ID 58831 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate17MWSummer 16 MW
Generators1in service
Net generation34GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202624.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20151.64.3%—
201640.527.7%—
201740.427.8%—
201838.527.5%—
201940.528.9%—
202033.824.1%—
202134.424.6%—
202227.219.4%—
20232820.0%—
202425.117.8%—
202534.424.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV-1Solar PhotovoltaicPV16.616Oct 2015Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%17 MW

Nearby plants

Within 80 km.
Woodmere Solar Farm15 MW0.8 km
Redwood 4 Solar Farm20 MW0.9 km
Regulus Solar Project60 MW4.3 km
Hayworth Solar27 MW6 km
Allied Potato1 MW9.4 km
Kern Oil & Refining Co5 MW10 km