Huron County, Michigan · EIA plant ID 58719 · Operator: DTE Electric Company
Nameplate75MWSummer 75 MW
Generators1in service
Net generation244GWh12 mo to Aug 2026
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2014
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2014 | 185.2 | 30.9% | — |
| 2015 | 265.8 | 40.6% | — |
| 2016 | 260.6 | 39.7% | — |
| 2017 | 169.9 | 25.9% | — |
| 2018 | 251.1 | 38.3% | — |
| 2019 | 255.1 | 38.9% | — |
| 2020 | 254.5 | 38.7% | — |
| 2021 | 235.1 | 35.9% | — |
| 2022 | 263.3 | 40.2% | — |
| 2023 | 218.6 | 33.4% | — |
| 2024 | 241.6 | 36.8% | — |
| 2025 | 254.9 | 38.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WPH2 | Onshore Wind Turbine | WT | 74.8 | 74.8 | Feb 2014 | Operating | — | ge 1.6-100 |
Owner / operator
Operator: DTE Electric Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| DTE Electric Company | 100.0% | 75 MW |
Nearby plants
Within 80 km.
| Pheasant Run Wind LLC | 75 MW | 0 km |
| Apple Blossom Wind Farm | 100 MW | 6.5 km |
| Oliver | 14 MW | 9 km |
| Harvest | 53 MW | 10.9 km |
| MSC Sebewaing | 3 MW | 12.1 km |
| Pine Street | 8 MW | 12.4 km |