Osage Wind, LLC

Osage County, Oklahoma · EIA plant ID 58683 · Operator: Enel Green Power NA, Inc.
WindOnshore Wind TurbineBA: AECI
Nameplate150MWSummer 150 MW
Generators1in service
Net generation480GWh12 mo to Dec 2025
Capacity factor36%wind units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202636.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2015299.138.7%—
2016570.943.2%—
2017600.145.6%—
2018559.842.5%—
2019565.542.9%—
2020559.242.3%—
2021562.442.7%—
2022584.544.4%—
2023511.938.9%—
202454941.6%—
2025480.336.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT150.4150.4Jun 2015Operating—ge 1.7-103

Owner / operator

Operator: Enel Green Power NA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Enel Green Power NA, Inc.100.0%150 MW

Nearby plants

Within 80 km.
Kaw Hydro37 MW20.3 km
Pawhuska9 MW31.7 km
Frontier Windpower II352 MW32.1 km
Ponca City134 MW34.4 km
Charles D. Lamb Energy Center122 MW39.7 km
Sooner1,138 MW42.3 km