Braley Road 2

Bristol County, Massachusetts · EIA plant ID 58680 · Operator: Mass Solar, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20153.718.9%—
20164.619.2%—
20174.620.0%—
20184.419.2%—
20194.419.4%—
20204.619.9%—
20214.419.2%—
20224.118.1%—
202328.6%—
20241.66.9%—
20253.917.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV2.62.6Mar 2015Operating—coming soon

Owner / operator

Operator: Mass Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Mass Solar, LLC100.0%3 MW

Nearby plants

Within 80 km.
Acushnet-Braley Road 12 MW0.3 km
Freetown MA 1, LLC1 MW1 km
Freetown Solar5 MW2 km
Washburn Road Solar2 MW2.8 km
Greater New Bedford LFG Utiliz. Facility3 MW3.1 km