← Back to map

Selma Solar LLC

Johnston County, North Carolina · EIA plant ID 58669 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 4 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202621.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20142.412.9%—
20157.817.8%—
20169.621.8%—
20179.421.5%—
2018925.6%—
2019925.6%—
20207.822.3%—
20218.724.8%—
20228.724.8%—
20237.621.6%—
20247.822.1%—
20257.621.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SELMASolar PhotovoltaicPV54Aug 2014Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%5 MW

Nearby plants

Within 80 km.
Bizzell Church Solar 1, LLC5 MW3 km
Bizzell Church Solar 25 MW3.6 km
Princeton5 MW8 km
Candace Solar5 MW10 km
Red Toad 4451 Buffalo Road, LLC2 MW10.5 km
Red Toad 5840 Buffalo Road, LLC2 MW10.8 km