Cape Cod Air Force Station - 6 SWS

Barnstable County, Massachusetts · EIA plant ID 58661 · Operator: US Air Force
WindOnshore Wind TurbineISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators2in service
Net generation6GWh12 mo to Aug 2026
Capacity factor21%wind units, summer MW
Heat rate—thermal plants only
First online2014

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.2500.250.50.751GWh2014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202620.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20147.826.3%—
20158.327.9%—
2016930.1%—
20179.231.0%—
2018826.9%—
20196.321.2%—
20208.628.9%—
2021826.8%—
20228.227.7%—
2023723.6%—
20244.615.5%—
20256.622.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GE-3Onshore Wind TurbineWT1.71.7Jan 2014Operating—ge 1.68-82.5
GE-4Onshore Wind TurbineWT1.71.7Jan 2014Operating—ge 1.68-82.5

Owner / operator

Operator: US Air Force. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
US Air Force100.0%3 MW