← Back to map

La Paz Solar TowerPlanned

La Paz County, Arizona · EIA plant ID 58652 · Operator: Enivromission, Inc
SolarBA: WALC

200 MW planned (Solar Thermal without Energy Storage), first expected Jun 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar Thermal without Energy StorageOT200200planned Jun 2030Planned—coming soon

Owner / operator

Operator: Enivromission, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Vidal Energy Center—26.4 km
Headgate Rock20 MW27.9 km
Parker Dam120 MW43.6 km
Atlas—44 km
Venable Solar 12 MW45.2 km
Venable Solar 22 MW45.4 km