Tillamook County, Oregon · EIA plant ID 58591 · Operator: Tillamook BioGas, LLC Digester
OtherOther Waste BiomassBA: BPAT
Nameplate1MWSummer 1 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh201420152017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%201420162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20132.5172.1%—
20145.764.8%—
20157.383.6%—
201700.0%—
201800.0%—
201900.0%—
202000.0%—
202100.0%—
20221.517.6%—
20230.67.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Other Waste BiomassIC11Nov 2013Operating—coming soon

Owner / operator

Operator: Tillamook BioGas, LLC Digester . Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tillamook BioGas, LLC Digester 100.0%1 MW

Nearby plants

Within 80 km.
SulusSolar283 MW41.4 km
Grand Ronde Solar2 MW42.9 km
Waterford Solar, LLC CSG3 MW43.9 km
Apricus Solar LLC3 MW46.3 km
Cosper Creek Solar (CSG)3 MW46.3 km
Butler Solar, LLC4 MW46.5 km