← Back to map

Sonora 1

Tuolumne County, California · EIA plant ID 58578 · Operator: CleanCapital Holdings
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor7%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20142016201820202022202420266.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20130.17.3%—
20143.828.5%—
20153.828.8%—
20163.828.8%—
20172.922.4%—
20183.727.8%—
20193.627.4%—
20203.627.2%—
20213.727.9%—
2022430.1%—
20232.720.8%—
20240.64.7%—
20250.96.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SON1Solar PhotovoltaicPV1.51.5Dec 2013Operating—coming soon

Owner / operator

Operator: CleanCapital Holdings. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CleanCapital Holdings100.0%2 MW

Nearby plants

Within 80 km.
Pacific-Ultrapower Chinese Station25 MW4.8 km
Sierra Energy Storage, LLC10 MW4.8 km
New Melones300 MW6.4 km
Sierra Pacific Chinese Camp4 MW6.6 km
Tulloch30 MW6.9 km
Angels1 MW20.3 km