← Back to map

Gilbert Solar Facility I, LLC

Maricopa County, Arizona · EIA plant ID 58543 · Operator: Gilbert Solar Facility I, LLC
SolarSolar PhotovoltaicBA: AZPS
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202624.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20134.721.6%—
20144.721.4%—
20152.611.8%—
20164.319.4%—
20174.118.9%—
20184.118.6%—
20193.516.2%—
2020313.6%—
20213.716.8%—
20222.913.3%—
20233.616.3%—
20243.822.8%—
2025424.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV21.9Oct 2011Operating—coming soon

Owner / operator

Operator: Gilbert Solar Facility I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Gilbert Solar Facility I, LLC100.0%2 MW

Nearby plants

Within 80 km.
Superstition Energy Storage90 MW2.7 km
Santan1,326 MW5.5 km
Kyrene596 MW12.3 km
South Consolidated1 MW12.5 km
Ocotillo806 MW12.6 km
Arizona State University CHP17 MW13.5 km