Cornerstone Power Vineland I LLC
Cumberland County, New Jersey · EIA plant ID 58512 · Operator: Altus Power America Management, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 5.4 | 19.8% | — |
| 2014 | 5.6 | 20.5% | — |
| 2015 | 5.6 | 20.6% | — |
| 2016 | 5.6 | 20.5% | — |
| 2017 | 5.3 | 19.7% | — |
| 2018 | 4.6 | 17.0% | — |
| 2019 | 5.3 | 19.4% | — |
| 2020 | 4.9 | 18.1% | — |
| 2021 | 5.1 | 18.6% | — |
| 2022 | 4.8 | 17.8% | — |
| 2023 | 3.9 | 14.4% | — |
| 2024 | 4.9 | 18.0% | — |
| 2025 | 4.2 | 15.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 3.1 | 3.1 | Feb 2012 | Operating | — | coming soon |
Owner / operator
Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Altus Power America Management, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Sherman Avenue | 113 MW | 1.7 km |
| Clayville | 73 MW | 2.7 km |
| Calpine Vineland Solar LLC | 4 MW | 3.3 km |
| The City of Vineland at West Vineland | 4 MW | 3.4 km |
| Vineland Solar LLC | 15 MW | 3.8 km |
| Cumberland County Solid Waste Complex | 5 MW | 4.3 km |