← Back to map

Delta Wind Farm

Southeast Fairbanks County, Alaska · EIA plant ID 58511 · Operator: Alaska Environmental Power
WindOnshore Wind Turbine
Nameplate2MWSummer 2 MW
Generators3in service
Net generation4GWh12 mo to Dec 2025
Capacity factor25%wind units, summer MW
Heat rate—thermal plants only
First online2008

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202625.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.614.0%—
20144.527.0%—
2015424.0%—
20164.426.6%—
20172.615.7%—
20184.527.0%—
2019423.8%—
20203.823.1%—
20213.721.9%—
2022423.8%—
2023423.9%—
20243.923.2%—
20254.225.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EWT1Onshore Wind TurbineWT0.90.9Oct 2009Operating—ewt DW54-900
EWT2Onshore Wind TurbineWT0.90.9Sep 2013Operating—northern power Northwind 100
NW1Onshore Wind TurbineWT0.10.1Sep 2008Operating—southwest windpower Skystream 3.7

Owner / operator

Operator: Alaska Environmental Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alaska Environmental Power100.0%2 MW

Nearby plants

Within 80 km.
Delta Power23 MW6.2 km
Fort Greely Power Plant7 MW7.4 km