Orange PV

Franklin County, Massachusetts · EIA plant ID 58411 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202614.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.113.0%—
20142.715.5%—
20152.916.3%—
20163.117.8%—
20172.715.6%—
20182.614.9%—
20190.63.5%—
2020316.8%—
20211.47.9%—
20222.715.6%—
20232.313.2%—
20242.614.7%—
20252.614.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SO023Solar PhotovoltaicPV22Jul 2013Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%2 MW

Nearby plants

Within 80 km.
Partridgeville Hybrid CSG5 MW3.3 km
Hunt Farm Solar3 MW3.5 km
W. Orange Rd Solar LLC5 MW4.4 km
Wilbur Woods Solar LLC5 MW5.1 km
OSG Solar 1 LLC3 MW6 km
Erving Paper Mills6 MW7.8 km