← Back to map

The Andersons Albion Ethanol LLC

Calhoun County, Michigan · EIA plant ID 58330 · Operator: The Andersons Albion Ethanol LLC
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Steam TurbineMISOBA: MISO
Nameplate10MWSummer 7 MW
Generators2in service
Net generation62GWh12 mo to Dec 2025
Capacity factor98%gas/coal/oil units, summer MW
Heat rate4,822Btu/kWhfossil units, electric fuel, HHV
First online2006Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2012201420162018202020222024202698.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
2,5005,0007,50010,00012,500201220142016201820202022202420264,822 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201200.1%11,753
201300.5%11,959
201400.5%11,649
20150.17.1%11,719
20160.12.1%4,899
201761.6113.4%4,838
201864.6119.0%4,838
201964.8119.4%4,838
202057.791.2%4,837
20216298.3%4,837
202260.495.8%4,836
202365.7104.2%4,465
202463.4100.3%4,643
20256298.2%4,822

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
9611Natural Gas Steam TurbineST21.2Aug 2006Operating (Out of service, expected back within the year)—coming soon
CHP-1Natural Gas Fired Combustion TurbineGT8.16Dec 2016Operating—coming soon

Owner / operator

Operator: The Andersons Albion Ethanol LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
The Andersons Albion Ethanol LLC100.0%10 MW

Nearby plants

Within 80 km.
Calhoun County Solar Project125 MW2 km
River Fork Solar, LLC149 MW3.9 km
Shipsterns Solar, LLC20 MW5.5 km
Jackson County Solar, LLC125 MW11.2 km
Marshall (MI)10 MW12.7 km
MEC South—14.2 km