Georgia Mountain Community Wind Farm
Chittenden County, Vermont · EIA plant ID 58238 · Operator: Greenbacker Renewable Energy Corporation
Nameplate10MWSummer 10 MW
Generators1in service
Net generation25GWh12 mo to Aug 2026
Capacity factor28%wind units, summer MW
Heat rate—thermal plants only
First online2012
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 0.1 | 1.0% | — |
| 2013 | 25.4 | 29.0% | — |
| 2014 | 32.5 | 37.1% | — |
| 2015 | 33.1 | 37.8% | — |
| 2016 | 30.9 | 35.2% | — |
| 2017 | 30.5 | 34.8% | — |
| 2018 | 26.5 | 30.2% | — |
| 2019 | 28.9 | 33.0% | — |
| 2020 | 29 | 33.0% | — |
| 2021 | 21.1 | 24.1% | — |
| 2022 | 30.7 | 35.1% | — |
| 2023 | 23.6 | 27.0% | — |
| 2024 | 27 | 30.7% | — |
| 2025 | 29 | 33.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GMCW | Onshore Wind Turbine | WT | 10 | 10 | Dec 2012 | Operating | — | goldwind GW 100/2500 |
Owner / operator
Operator: Greenbacker Renewable Energy Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Greenbacker Renewable Energy Corporation | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Milton | 7 MW | 4.1 km |
| Clark Falls | 3 MW | 4.9 km |
| Georgia Ballard BESS | 5 MW | 5.9 km |
| Fairfax Falls | 4 MW | 5.9 km |
| Peterson | 6 MW | 7.8 km |
| Saint Albans Solar | 5 MW | 13.4 km |