← Back to map

Lee Combined Cycle Plant

Wayne County, North Carolina · EIA plant ID 58215 · Operator: Duke Energy Progress - (NC)
Natural gasNatural Gas Fired Combined Cycle⛽ Dual-fuelBA: DUK
Nameplate1,068MWSummer 888 MW
Generators4in service
Net generation5,695GWh12 mo to Aug 2026
Capacity factor73%gas/coal/oil units, summer MW
Heat rate7,108Btu/kWhfossil units, electric fuel, HHV
First online2012Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600GWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%201420162018202020222024202673.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,2007,4007,60020142016201820202022202420267,108 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20136,547.881.6%7,004
20145,730.771.9%7,046
20156,472.881.2%7,373
20166,402.382.1%7,259
20177,29393.8%7,233
20187,210.792.7%7,259
20196,648.585.5%7,380
20205,65472.5%7,459
20215,478.570.4%7,342
20226,04177.7%7,583
20236,374.682.0%7,360
20246,549.484.0%7,191
20255,735.873.7%7,210

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo668 MMBtu
Last month with liquid burnApr 2024
Switch while operatingYes
Net summer MW on gas888
Net summer MW on oil888
Time gas → oilup to 6 h (EIA 6H)
Time oil → gasup to 6 h (EIA 6H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1ANatural Gas Fired Combined CycleCT221170Dec 2012Operating—coming soon
1BNatural Gas Fired Combined CycleCT221170Dec 2012Operating—coming soon
1CNatural Gas Fired Combined CycleCT221170Dec 2012Operating—coming soon
ST1Natural Gas Fired Combined CycleCA405378Dec 2012Operating—coming soon
ST01—CA———not_current—coming soon

Owner / operator

Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Progress - (NC)100.0%1,068 MW

Nearby plants

Within 80 km.
Wayne County980 MW0.8 km
Stevens Mill Solar—3.4 km
Lane Solar5 MW4.2 km
Lane II Solar, LLC5 MW4.4 km
Wayne Solar II LLC5 MW6.5 km
New Rosewood BESS3 MW7.2 km