Cinnamon Bay Edgeboro Landfill
Middlesex County, New Jersey · EIA plant ID 58208 · Operator: Cinnamon Bay LLC
Nameplate10MWSummer 6 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2011
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 63.7 | 79.7% | — |
| 2013 | 58.2 | 73.0% | — |
| 2014 | 52.7 | 66.1% | 10,379 |
| 2015 | 46.8 | 56.0% | 11,151 |
| 2016 | 41.5 | 49.5% | 11,591 |
| 2017 | 35.7 | 43.2% | 12,076 |
| 2018 | 30.5 | 37.6% | 8,671 |
| 2020 | 21.5 | 26.8% | 11,426 |
| 2021 | 22 | 16.4% | 19,483 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Landfill Gas | IC | 9.6 | 6 | Aug 2011 | Operating | — | coming soon |
Owner / operator
Operator: Cinnamon Bay LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cinnamon Bay LLC | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| ILR Landfill | 7 MW | 1 km |
| South River 2 | 10 MW | 2.7 km |
| South River BESS Phase 1 | 10 MW | 2.8 km |
| Silver Lake Solar Farm | 2 MW | 3.3 km |
| Milltown Onsite BESS | — | 3.7 km |
| Sayreville | 212 MW | 3.7 km |