Jawbone Wind ProjectUnder construction
Wheatland County, Montana · EIA plant ID 58175 · Operator: Triple Oak Power LLC
80 MW under construction (Onshore Wind Turbine), first expected Dec 2029 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 80 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| JWPI | Onshore Wind Turbine | WT | 80 | 80 | planned Dec 2029 | Under construction | — | coming soon |
Owner / operator
Operator: Triple Oak Power LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Judith Gap Wind Energy Center | 135 MW | 7.4 km |
| Two Dot Wind Farm | 10 MW | 28.3 km |
| Musselshell Wind Project Two LLC | 10 MW | 32 km |
| Musselshell Wind Project | 10 MW | 32 km |
| Gordon Butte Wind LLC | 18 MW | 47.9 km |
| Haymaker Hybrid | — | 53.9 km |