← Back to map

Smith College Central Heating Plant

Hampshire County, Massachusetts · EIA plant ID 58166 · Operator: The Trustees of Smith College
Natural gasNatural Gas Fired Combustion TurbineISONEBA: ISNE
Nameplate5MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor27%gas/coal/oil units, summer MW
Heat rate4,062Btu/kWhfossil units, electric fuel, HHV
First online2008Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2012201420162018202020222024202627.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
2,5005,0007,50010,00012,500201220142016201820202022202420264,062 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201216.469.2%11,605
20131771.7%11,605
20141771.9%11,605
20151772.0%11,605
20161563.2%4,145
201714.862.8%4,145
201813.758.1%4,145
201912.954.7%4,145
20201042.2%4,062
202113.456.6%4,062
202214.360.4%4,062
202315.163.8%4,062
202414.259.7%4,062
20256.527.3%4,062

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT-1Natural Gas Fired Combustion TurbineGT5.32.7Oct 2008Operating—coming soon

Owner / operator

Operator: The Trustees of Smith College. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
The Trustees of Smith College100.0%5 MW

Nearby plants

Within 80 km.
Beacon Solar, LLC10 MW4.4 km
Hatfield Renewables Community Solar2 MW5.2 km
Mt. Tom Solar Project Hybrid8 MW5.7 km
Easthampton Landfill-City of Easthampton2 MW5.8 km
CED Northampton Solar LLC Hybrid7 MW5.9 km
Syncarpha Northampton Hybrid CSG6 MW6.3 km