SolarSolar PhotovoltaicCAISOBA: BANC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202611.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20126.123.1%—
2013726.5%—
20146.926.1%—
20156.223.4%—
20165.320.0%—
20175.621.2%—
20186.123.2%—
20195.721.5%—
20203.312.6%—
20214.316.4%—
20222.18.0%—
20232.410.0%—
20243.213.5%—
20252.711.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DPSSSolar PhotovoltaicPV32.7Dec 2010Operating—coming soon

Owner / operator

Operator: Depot Park Solar Farm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Depot Park Solar Farm100.0%3 MW

Nearby plants

Within 80 km.
SCA Cogen 2193 MW1.8 km
FRV SI Transport Solar LP1 MW3.2 km
CSU Sacramento I1 MW4.7 km
Department of Justice2 MW5.7 km
KP South Sacramento Hospital Solar2 MW6.4 km
SPA Cogen 3174 MW6.6 km