Georgia-Pacific Toledo Mill

Lincoln County, Oregon · EIA plant ID 58109 · Operator: Georgia-Pacific Toledo LLC
OtherWood/Wood Waste BiomassBA: BPAT
Nameplate19MWSummer 13 MW
Generators1in service
Net generation47GWh12 mo to Dec 2025
Capacity factor28%other units, summer MW
Heat rate10,152Btu/kWhfossil units, electric fuel, HHV
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202627.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,00010,00011,00012,0002012201420162018202020222024202610,152 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20127417.8%11,844
20134611.4%11,843
201426.96.6%11,844
201542.610.8%11,843
201647.411.9%10,152
201758.914.2%10,152
201857.214.8%10,152
201900.0%—
202000.0%—
202100.0%—
202220.99.5%9,748
202359.630.3%10,152
202456.226.2%10,152
20254727.5%10,152

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TG2Wood/Wood Waste BiomassST18.813.4Feb 2007Operating—coming soon
TG1Wood/Wood Waste BiomassST18.518.4Feb 2007Retired Apr 2013—coming soon

Owner / operator

Operator: Georgia-Pacific Toledo LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Georgia-Pacific Toledo LLC100.0%19 MW

Nearby plants

Within 80 km.
Oregon University System Rabbit Field1 MW48.9 km
Oregon State University Energy Center6 MW51.2 km
Grand Ronde Solar2 MW55.3 km
Coffin Butte6 MW56.8 km
Waterford Solar, LLC CSG3 MW58.2 km
Cosper Creek Solar (CSG)3 MW60.2 km