← Back to map

SABIC Innovative Plastics Mt. Vernon

Posey County, Indiana · EIA plant ID 58063 · Operator: SABIC IP Mt. Vernon, LLC
Natural gasNatural Gas Fired Combustion TurbineMISOBA: MISO
Nameplate108MWSummer 79 MW
Generators1in service
Net generation580GWh12 mo to Aug 2026
Capacity factor84%gas/coal/oil units, summer MW
Heat rate11,730Btu/kWhfossil units, electric fuel, HHV
First online2017Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202684.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
11,00011,25011,50011,75012,00020162018202020222024202611,730 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201300.0%—
201400.0%—
20151.24.7%11,372
201617.666.6%11,373
2017635.192.2%11,404
2018566.782.3%11,686
2019640.393.0%11,613
2020487.170.5%11,681
2021515.174.8%11,474
2022560.381.4%11,176
2023510.274.1%11,785
2024431.862.5%11,747
2025478.469.5%11,928

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
COGN1Natural Gas Fired Combustion TurbineGT10878.6Jan 2017Operating—coming soon
1Conventional Steam CoalST5.53Jun 1996Retired Jan 2017—coming soon

Owner / operator

Operator: SABIC IP Mt. Vernon, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SABIC IP Mt. Vernon, LLC100.0%108 MW

Nearby plants

Within 80 km.
Posey Solar191 MW17.4 km
A B Brown647 MW18.5 km
Patoka Solar—28.8 km
Henderson County Solar—29.3 km
Carmi13 MW29.3 km
Norris City 2—32.8 km