Decatur-Morgan Co LFG Recovery Project
Morgan County, Alabama · EIA plant ID 58061 · Operator: Energy Developments Inc
Nameplate2MWSummer 2 MW
Generators2in service
Net generation9GWh12 mo to Dec 2025
Capacity factor67%other units, summer MW
Heat rate—thermal plants only
First online2010
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 0 | 0.0% | — |
| 2013 | 11.9 | 84.6% | — |
| 2014 | 12.4 | 88.4% | — |
| 2015 | 12.1 | 86.1% | — |
| 2016 | 11 | 78.0% | — |
| 2017 | 11.6 | 82.8% | — |
| 2018 | 12.6 | 89.6% | — |
| 2019 | 12.6 | 89.6% | — |
| 2020 | 12.9 | 91.5% | — |
| 2021 | 13.4 | 95.5% | — |
| 2022 | 13 | 93.0% | — |
| 2023 | 10.7 | 76.6% | — |
| 2024 | 9.6 | 68.3% | — |
| 2025 | 9.3 | 66.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1496 | Landfill Gas | IC | 0.8 | 0.8 | Aug 2010 | Operating | — | coming soon |
| 290 | Landfill Gas | IC | 0.8 | 0.8 | Jul 2011 | Operating | — | coming soon |
Owner / operator
Operator: Energy Developments Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Energy Developments Inc | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Morgan Energy Center | 900 MW | 3.8 km |
| Decatur Energy Center | 902 MW | 7.3 km |
| Browns Ferry | 3,854 MW | 9.1 km |
| Hillsboro Solar 3 | — | 13.1 km |
| Lawrence County Solar | — | 13.8 km |
| Wheeler Dam | 404 MW | 32.8 km |