← Back to map

MillerCoors Shenandoah Brewery

Rockingham County, Virginia · EIA plant ID 58057 · Operator: MillerCoors Shenandoah Brewery
OtherOther Waste BiomassPJMBA: PJM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation5GWh12 mo to Aug 2026
Capacity factor40%other units, summer MW
Heat rate—thermal plants only
First online2012

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2012201420162018202020222024202640.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20122.940.4%—
20135.141.7%—
20141.29.9%—
20151.714.0%—
20162.822.4%—
20175.645.6%—
20185.645.3%—
20193.427.8%—
20204.133.5%—
20215.847.5%—
20225.242.3%—
20236.149.9%—
20245.847.4%—
20257.661.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WWTPOther Waste BiomassGT1.41.4Jun 2012Operating—coming soon

Owner / operator

Operator: MillerCoors Shenandoah Brewery. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MillerCoors Shenandoah Brewery100.0%1 MW

Nearby plants

Within 80 km.
Elkton14 MW3.6 km
Merck2 MW4.1 km
Sun Ridge Solar—7.5 km
Pleasant Valley (VA)21 MW19.9 km
Mount Clinton24 MW20.5 km
Newport Hydro Station1 MW24.9 km