SolarSolar PhotovoltaicPJMBA: PJM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150MWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2012201420162018202020222024202613.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120.10.8%—
20131.412.0%—
2014-0.1-0.6%—
20150.87.2%—
20160.75.9%—
20170.87.1%—
201800.0%—
20190.11.1%—
20201.513.0%—
20210.11.1%—
20221.412.1%—
20231.513.2%—
20241.413.2%—
20251.412.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PVSolar PhotovoltaicPV1.31.2Nov 2011Operating—coming soon

Owner / operator

Operator: Jordache Enterprises. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Jordache Enterprises100.0%1 MW

Nearby plants

Within 80 km.
Hall's Warehouse Solar Project2 MW2.3 km
Glopak Solar PV Power Plant1 MW2.6 km
145 Talmadge Solar4 MW2.6 km
Edison 7205 Solar1 MW2.9 km
Prologis Edison 0503 - SLCNJ005 - Community Solar1 MW3 km
Edison 0308 Solar3 MW3.4 km