← Back to map

High Mesa

Twin Falls County, Idaho · EIA plant ID 58019 · Operator: High Mesa Energy LLC
WindOnshore Wind TurbineBA: IPCO
Nameplate40MWSummer 40 MW
Generators1in service
Net generation67GWh12 mo to Aug 2026
Capacity factor19%wind units, summer MW
Heat rate—thermal plants only
First online2012

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202619.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201239.9%—
201389.225.5%—
201497.727.9%—
201580.923.1%—
201699.328.3%—
201786.424.6%—
201896.527.6%—
201992.826.6%—
202092.626.4%—
202193.726.8%—
20228223.5%—
20238424.0%—
202491.526.1%—
202576.421.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT4039.9Dec 2012Operating—suzlon S97-2100

Owner / operator

Operator: High Mesa Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
High Mesa Energy LLC100.0%40 MW

Nearby plants

Within 80 km.
Cassia Gulch19 MW1.7 km
Tuana Springs17 MW2.2 km
Cassia Wind8 MW4 km
Bliss75 MW4.7 km
Thousand Springs Wind Park12 MW5.7 km
Oregon Trail Wind Park14 MW5.8 km