← Back to map

Grand Ridge Solar Farm

LaSalle County, Illinois · EIA plant ID 57912 · Operator: Invenergy Services LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate20MWSummer 20 MW
Generators1in service
Net generation30GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2012

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh201220132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202616.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201215.617.6%—
201334.319.6%—
201431.317.9%—
201530.117.2%—
201629.416.7%—
201732.318.5%—
201831.217.8%—
201930.417.3%—
202030.117.1%—
202129.716.9%—
202228.116.0%—
202327.815.9%—
202424.413.9%—
202531.117.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2020Jul 2012Operating—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invenergy Services LLC100.0%20 MW

Nearby plants

Within 80 km.
USS Man Solar LLC1 MW8.9 km
Segunda II (CSG)2 MW9.3 km
Allen Acres Solar—10.3 km
NL IL 1400 East—10.3 km
LaSalle Solar 12 MW10.8 km
Grand Ridge Battery Projects36 MW11.2 km