← Back to map

Hurricane City Power

Washington County, Utah · EIA plant ID 57899 · Operator: Hurricane City Power
Natural gasNatural Gas Internal Combustion EnginePetroleum LiquidsBA: PACE

2 MW planned (Natural Gas Internal Combustion Engine), first expected May 2028 · EIA-860M

Nameplate15MWSummer 14 MW
Generators8in service
Net generation7GWh12 mo to Dec 2025
Capacity factor6%gas/coal/oil units, summer MW
Heat rate11,367Btu/kWhfossil units, electric fuel, HHV
First online1999Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%201220142016201820202022202420265.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00012,50015,00017,5002012201420162018202020222024202611,367 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20111.30.9%15,237
20122.81.9%14,325
201342.8%14,662
20142.31.8%12,039
20152.72.1%13,729
20162.62.1%11,714
201721.6%11,488
20184.93.9%11,287
20192.82.3%11,330
20204.83.9%11,272
20214.63.7%18,147
20228.36.6%11,257
20233.52.8%12,895
20247.45.9%11,306
202575.6%11,367

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC1.71.6Nov 2001Operating (Standby / backup)—coming soon
2Petroleum LiquidsIC1.71.6Dec 1999Operating (Standby / backup)—coming soon
3Petroleum LiquidsIC1.71.6Dec 1999Operating (Standby / backup)—coming soon
4Natural Gas Internal Combustion EngineIC21.9Jul 2004Operating—coming soon
5Natural Gas Internal Combustion EngineIC21.9Jul 2004Operating—coming soon
6Natural Gas Internal Combustion EngineIC21.9Jun 2006Operating—coming soon
7Natural Gas Internal Combustion EngineIC21.9May 2007Operating—coming soon
8Natural Gas Internal Combustion EngineIC21.9May 2007Operating—coming soon
9Natural Gas Internal Combustion EngineIC21.9May 2007Planned—coming soon

Owner / operator

Operator: Hurricane City Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hurricane City Power100.0%15 MW

Nearby plants

Within 80 km.
Quail Creek Hydro Plant #12 MW5.4 km
Washington City Electric Generation6 MW13 km
Millcreek Power Generation80 MW21.1 km
St George Red Rock14 MW25.3 km
Solomon Generating Facility15 MW29.2 km
Bloomington Solar I2 MW33.2 km