Green Acres Solar Facility 1

Sacramento County, California · EIA plant ID 57849 · Operator: SEAI Elk Grove LLC
SolarSolar PhotovoltaicCAISOBA: BANC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202612.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20121.719.8%—
20136.725.5%—
20146.725.5%—
20157.128.8%—
20166.727.3%—
20176.526.4%—
20186.425.9%—
20196.325.8%—
20205.723.1%—
2021520.6%—
20225.723.3%—
20234.819.7%—
20243.916.0%—
20253.112.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GASF1Solar PhotovoltaicPV32.8Sep 2012Operating—coming soon

Owner / operator

Operator: SEAI Elk Grove LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
OL Elk Grove Trust100.0%3 MW

Nearby plants

Within 80 km.
Green Acres Solar Facility 21 MW0.3 km
SMUD at Lawrence1 MW7 km
RE Bruceville 1 LLC5 MW8.6 km
RE Bruceville 2 LLC5 MW8.6 km
RE Bruceville 3 LLC5 MW8.6 km
SMUD at Grundman17 MW10.2 km