← Back to map

RE McKenzie 6 LLC

Sacramento County, California · EIA plant ID 57821 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: BANC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation12GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202626.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120.911.7%—
201312.929.5%—
201412.328.0%—
201512.328.1%—
201612.428.2%—
20171227.4%—
201812.328.2%—
201911.927.2%—
202011.526.1%—
202111.526.4%—
20221227.3%—
202311.426.1%—
202411.626.3%—
202511.626.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MCK6Solar PhotovoltaicPV55Nov 2012Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE McKenzie 6 LLC100.0%5 MW

Nearby plants

Within 80 km.
RE McKenzie 2 LLC5 MW0 km
RE McKenzie 4 LLC5 MW0 km
RE McKenzie 5 LLC5 MW0 km
RE McKenzie 3 LLC5 MW0 km
RE McKenzie 1 LLC5 MW0 km
SMUD at Van Conett3 MW5.7 km