← Back to map

Lime Wind

Baker County, Oregon · EIA plant ID 57803 · Operator: Lime Wind LLC
WindOnshore Wind TurbineBA: IPCO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor21%wind units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202620.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.312.9%—
20125.922.3%—
20136.424.4%—
20145.822.0%—
20156.123.2%—
20165.922.3%—
20175.520.8%—
20186.123.1%—
20195.922.6%—
20205.320.1%—
20216.324.0%—
20225.520.9%—
20234.818.2%—
20245.320.2%—
20255.420.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
T1-6Onshore Wind TurbineWT33Dec 2011Operating—nordtank NTK 500/41

Owner / operator

Operator: Lime Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Lime Wind LLC100.0%3 MW

Nearby plants

Within 80 km.
Willow Spring Windfarm (Burnt River)10 MW1.7 km
Prospector Windfarm (Burnt River)10 MW2.7 km
Jett Creek Windfarm (Burnt River)10 MW3.1 km
Durbin Creek Windfarm (Burnt River)10 MW6.3 km
Benson Creek Windfarm (Burnt River)10 MW6.6 km
Weiser BESS3 MW28.2 km