← Back to map

Perdue Bridgeville Photovoltaic

Sussex County, Delaware · EIA plant ID 57772 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202615.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.58.3%—
20122.218.9%—
20132.118.1%—
2014217.8%—
2015217.7%—
2016217.8%—
20171.816.2%—
20181.412.7%—
20191.917.1%—
202000.0%—
202100.0%—
20221.816.1%—
20231.815.8%—
2024217.4%—
20251.815.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRIDSolar PhotovoltaicPV1.31.3Jul 2011Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%1 MW

Nearby plants

Within 80 km.
Heimlich Solar5 MW4.2 km
Rifle Range Road Solar—4.4 km
DE-ECA CS Seaford3 MW9.4 km
Federalsburg Energy Storage 1 LLC2 MW16.1 km
Raceway Solar—17 km
SU942 MW19.1 km