← Back to map

Maple Solar

Cumberland County, New Jersey · EIA plant ID 57750 · Operator: NFI Solar LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20111.815.4%—
20124.219.9%—
2013419.2%—
2014419.2%—
2015418.9%—
2016418.9%—
2017419.2%—
20184.119.4%—
20194.119.5%—
20203.918.6%—
2021419.0%—
20224.119.5%—
20233.315.5%—
2024419.0%—
20253.617.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
P1Solar PhotovoltaicPV1.61.6May 2011Operating—coming soon
P2Solar PhotovoltaicPV0.80.8Sep 2011Operating—coming soon

Owner / operator

Operator: NFI Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NFI Solar LLC100.0%2 MW

Nearby plants

Within 80 km.
Cedar Branch6 MW2.3 km
The City of Vineland at North Vineland2 MW2.4 km
Corning Pharmaceutical Glass2 MW3.4 km
Howard Down68 MW4.6 km
Vineland Headquarters1 MW4.9 km
Atlantic Coast Freezers Solar Facility2 MW5.5 km