Laurel Hill Wind
Lycoming County, Pennsylvania · EIA plant ID 57744 · Operator: Duke Energy Renewables Services
Nameplate69MWSummer 69 MW
Generators1in service
Net generation110GWh12 mo to Aug 2026
Capacity factor18%wind units, summer MW
Heat rate—thermal plants only
First online2012
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 48.3 | 23.9% | — |
| 2013 | 172.6 | 28.6% | — |
| 2014 | 181.3 | 30.0% | — |
| 2015 | 172.5 | 28.5% | — |
| 2016 | 183.5 | 30.3% | — |
| 2017 | 170.7 | 28.2% | — |
| 2018 | 168.2 | 27.8% | — |
| 2019 | 155.4 | 25.7% | — |
| 2020 | 173.2 | 28.6% | — |
| 2021 | 158 | 26.1% | — |
| 2022 | 226.8 | 37.5% | — |
| 2023 | 154.1 | 25.5% | — |
| 2024 | 132.3 | 21.8% | — |
| 2025 | 122.7 | 20.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 69 | 69 | Sep 2012 | Operating | — | siemens SWT-2.3-108 |
Owner / operator
Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Renewables Services | 100.0% | 69 MW |
Nearby plants
Within 80 km.
| Beaver Dam | 22 MW | 17.8 km |
| Blossburg | 24 MW | 19.8 km |
| Alpaca | 21 MW | 23.6 km |
| Armenia Mountain Wind Farm | 101 MW | 29.4 km |
| PPL Martins Creek LLC Williamsport | retired | 33 km |
| Jordan Energy-DFA Middlebury Center Plan | 1 MW | 39.7 km |