Paulding Wind Farm II
Paulding County, Ohio · EIA plant ID 57620 · Operator: Paulding Wind Farm II LLC
Nameplate99MWSummer 99 MW
Generators1in service
Net generation316GWh12 mo to Aug 2026
Capacity factor36%wind units, summer MW
Heat rate—thermal plants only
First online2011
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 152.8 | 23.1% | — |
| 2012 | 246.8 | 18.7% | — |
| 2013 | 279.4 | 32.2% | — |
| 2014 | 327.7 | 37.8% | — |
| 2015 | 336.9 | 38.8% | — |
| 2016 | 331.6 | 38.1% | — |
| 2017 | 344.9 | 39.8% | — |
| 2018 | 311.7 | 35.9% | — |
| 2019 | 322.8 | 37.2% | — |
| 2020 | 314 | 36.1% | — |
| 2021 | 301.9 | 34.8% | — |
| 2022 | 334.8 | 38.6% | — |
| 2023 | 300.2 | 34.6% | — |
| 2024 | 302 | 34.7% | — |
| 2025 | 318.3 | 36.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | WT | 99 | 99 | Jul 2011 | Operating | — | vestas V100-1.8 |
Owner / operator
Operator: Paulding Wind Farm II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Paulding Wind Farm II LLC | 100.0% | 99 MW |
Nearby plants
Within 80 km.
| Timber Road Solar Park | 50 MW | 8.7 km |
| Paulding Wind Farm III | 101 MW | 10.9 km |
| Timber Road IV | 125 MW | 10.9 km |
| Robert P Mone Plant | 597 MW | 11.1 km |
| Northwest Ohio Wind | 110 MW | 15.6 km |
| Haviland Plastic Products | 5 MW | 16.1 km |