Walnut Creek Energy Park

Los Angeles County, California · EIA plant ID 57515 · Operator: NRG Walnut Creek LLC
Natural gasNatural Gas Fired Combustion TurbineCAISOBA: CISO
Nameplate500MWSummer 501 MW
Generators5in service
Net generation67GWh12 mo to Aug 2026
Capacity factor2%gas/coal/oil units, summer MW
Heat rate9,569Btu/kWhfossil units, electric fuel, HHV
First online2013Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20020406080GWh2014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20142016201820202022202420261.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,0009,50010,00020142016201820202022202420269,569 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2013316.110.1%9,589
2014489.411.5%9,660
2015439.710.3%9,707
2016445.610.5%9,800
2017347.28.2%9,763
20183829.0%10,213
2019456.210.7%9,801
2020419.49.8%9,891
2021249.85.9%9,523
2022492.311.6%9,190
2023371.48.7%9,334
2024278.26.3%9,207
202545.11.0%9,906

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT1Natural Gas Fired Combustion TurbineGT100100.1Apr 2013Operating—coming soon
GT2Natural Gas Fired Combustion TurbineGT100100.1Apr 2013Operating—coming soon
GT3Natural Gas Fired Combustion TurbineGT100100.1Apr 2013Operating—coming soon
GT4Natural Gas Fired Combustion TurbineGT100100.1Apr 2013Operating—coming soon
GT5Natural Gas Fired Combustion TurbineGT100100.1May 2013Operating—coming soon

Owner / operator

Operator: NRG Walnut Creek LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NRG Walnut Creek LLC100.0%500 MW

Nearby plants

Within 80 km.
Marici—0.2 km
MM West Covina7 MW4.5 km
Puente Hills Energy Recovery50 MW7.5 km
Walnut Unified School District Walnut HS Hybrid2 MW8.8 km
Industry MetroLink PV 12 MW9.1 km
Coyote Creek3 MW9.4 km