← Back to map

Laurel Wind Farm

Marshall County, Iowa · EIA plant ID 57500 · Operator: MidAmerican Energy Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate123MWSummer 120 MW
Generators1in service
Net generation470GWh12 mo to Dec 2025
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2012201420162018202020222024202644.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201127.230.6%—
2012393.237.4%—
201339737.9%—
2014371.435.4%—
2015384.336.7%—
201637535.7%—
2017379.736.2%—
2018334.932.0%—
2019340.432.5%—
2020343.332.7%—
2021360.534.4%—
2022360.734.4%—
2023431.341.2%—
2024463.144.1%—
202547044.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LWFOnshore Wind TurbineWT123.4119.6Dec 2011Operating—siemens SWT-2.3-101

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%123 MW

Nearby plants

Within 80 km.
Marshalltown Generating Station709 MW18.5 km
Marshalltown189 MW19.2 km
Alliant SBD 9107 JBS USA11 MW19.4 km
Grinnell Customer Hosted Solar5 MW22.1 km
Grinnell College4 MW22.4 km
State Center7 MW24.1 km