Sentinel Energy Center, LLC
Riverside County, California · EIA plant ID 57482 · Operator: CPV Sentinel LLC
Nameplate800MWSummer 800 MW
Generators8in service
Net generation189GWh12 mo to Aug 2026
Capacity factor3%gas/coal/oil units, summer MW
Heat rate9,600Btu/kWhfossil units, electric fuel, HHV
First online2013Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 309.2 | 6.6% | 9,862 |
| 2014 | 490.5 | 7.0% | 9,932 |
| 2015 | 656.9 | 9.4% | 9,863 |
| 2016 | 449.3 | 6.4% | 10,068 |
| 2017 | 489.2 | 7.0% | 9,856 |
| 2018 | 485.7 | 6.9% | 10,257 |
| 2019 | 576.7 | 8.2% | 9,835 |
| 2020 | 608.2 | 8.7% | 9,804 |
| 2021 | 615.9 | 8.8% | 9,612 |
| 2022 | 509.2 | 7.3% | 9,965 |
| 2023 | 554.4 | 7.9% | 9,568 |
| 2024 | 419.8 | 6.0% | 9,401 |
| 2025 | 140.1 | 2.0% | 9,732 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CTG1 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG2 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG3 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG4 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG5 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG6 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG7 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
| CTG8 | Natural Gas Fired Combustion Turbine | GT | 100 | 100 | May 2013 | Operating | — | coming soon |
Owner / operator
Operator: CPV Sentinel LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Meridian Clean Energy | 50.0% | 400 MW |
| Diamond Generating Corporation | 50.0% | 400 MW |
Nearby plants
Within 80 km.
| Desert Peak Energy Storage I | 325 MW | 0.3 km |
| Desert Peak Energy Storage II | 75 MW | 0.3 km |
| San Gorgonio Westwinds II LLC | 43 MW | 0.6 km |
| Mountain View I&2 | 71 MW | 1.6 km |
| Karen Avenue Wind Farm | 12 MW | 1.6 km |
| San Gorgonio Windplant WPP1993 | 50 MW | 1.8 km |