← Back to map

NRG Solar Borrego I

San Diego County, California · EIA plant ID 57455 · Operator: NRG Solar Borrego I
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate26MWSummer 26 MW
Generators1in service
Net generation61GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202626.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120——
20136732.1%—
201473.132.1%—
201571.431.4%—
201671.131.1%—
20176930.3%—
201868.530.1%—
201966.429.1%—
202065.228.5%—
202170.430.9%—
202264.728.4%—
202364.628.4%—
202462.227.2%—
202561.326.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SB1Solar PhotovoltaicPV2626Feb 2013Operating—coming soon

Owner / operator

Operator: NRG Solar Borrego I. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NRG Solar Borrego I100.0%26 MW

Nearby plants

Within 80 km.
Desert Green Solar Farm LLC6 MW3.2 km
Dark Sky Energy Center7 MW3.2 km
Borrego Springs Energy Storage2 MW3.2 km
Morongo CRS 13 MW30.5 km
Ocotillo Wells100 MW34.7 km
Seville 120 MW37.6 km